S. No. | Name of Projects |
1 | Feasibility Study and Detailed Project Report for 4/6 laning of selected project under Group-A of NHDP-II - Kottakata to Kurnool Section of NH-7 from Km. 133 to Km. 211 in the State of Andhra Pradesh. |
2 |
Quality Assurance System for 4 laning of NH-2 in U.P. for World Bank Funded Project: 1. Allahabad – Khaga Highway 2. Varanasi – Handia Highway |
3 | Advisory Services and Quality Assurance System for the Project "Four laning of Km. 143/0 to Km 160/0 of Gondal Ribda Section of NH 8B in the State of Gujarat under Phase-II Programme of North-South & East-West Corridors Project" Contract Package No. EW-10/GJ. |
4 | Pre Tendering, Preliminary Design and cost estimate for 4 laning of 41 km long 2 lane National Highway from Nagpur (Km 9.2) to Kondhali (Km 50) on BOT under Non-NHDP Project of NHAI. |
5 | Pre Tendering, Preliminary design and Cost estimmate for 4 laning of 50 km long 2 lane National Highway from Kondhali (Km 50) to Talegaon (Km 100) on BOT under Non-NHDP Project of NHAI. |
6 | Pre Tendering, Preliminary design and Cost estimmate for 4 laning of 50 km long 2 lane National Highway from Indore (Km 50) to Kalaghat (Km 100) on BOT under Non-NHDP Project of NHAI. |
7 | Detailed Design of State Highway Section between Phalodi and Sanchore (Gujarat Border) – 286 Kms. of 2 lane / single lane Highway on BOT. |
8 | Pre Tendering, Preliminary design and Cost estimmate for 4 laning of 2 lane National Highway from Ambala to Chandigarh in Punjab – BOT under Non NHDP Project of NHAI. |
9 | Pre Tendering, Preliminary design and Cost estimmate 4 laning of 50 Km long 2 lane National Highway from Jallandhar to Amritsar on BOT under Non-NHDP Project of NHAI. |
10 | Feasibility Report & Detailed Projects Report for Chas – Ramgarh – Dhanbad – Gumla Section of NH-32 & NH-23 in the State of Jharkhand |
11 | Construction Supervision and Quality Control of City Roads in Jabalpur (Chhotiline Phatak to Medical College of 6.200 Kms.) in the State of Madhya Pradesh. |
12 | Pre Tendering, Preliminary design and Cost estimmate for 4-laning of Palanpur - Swaroopganj Section (Km. 264.00 to Km. 340.00 of NH-14) in the States of Gujarat & Rajasthan under East-West Corridor of NHDP in India. |
13 | Project Advisory consultacy Services including review of Detailed Project Report for four laning of Orai - Bhognipur Section (Km. 220.00 to Km. 255.00) of NH-25) & Bhognipur - Barah Section (Km. 421.20 to Km. 449.00 of NH-2) in the State of U.P. under East West Corridor of NHDP in India. |
14 | Review of detailed Design & Construction Supervision for 4-laning & strengthening of existing 2-lane from Trichy Bypass End (Km. 0.0) to Madurai (Km. 124.840) of NH-45B (Package VII-A & VII-B) (DESIGN PART) (CONSTRUCTION PART) |
15 | Pre Tendering, Preliminary design and Cost estimmate for 4-laning of Kurali - Kiratpur Section (Km. 28.600 to Km. 73.200 of NH-21 in the State of Punjab) |
16 | Pre Tendering, Preliminary design and Cost estimmate for 4-laning of Muzaffarnagar - Haridwar Section (Km. 131.000 to Km. 209.000 of NH-58 in the State of U.P. & Uttaranchal |
17 | Feasibility Study and DPR for Construction of Manali Bypass on NH-21 in Himachal Pradesh. |
18 | Consultancy Services for the Pre tendering Services for Delhi-Haryana Border to Rohtak Section of NH-10 under DBFOT |
19 | Lenders' Independent Engineer for Orai Bhognipur NH 2 UP |
20 | Consultancy Services for the Construction Supervision of 6 Lane Divided Carriage- Way of Ranchi Ring Road Section-VII |
21 | World Bank funded Feasibility & DDPR for construction, Up gradation and Improvement of Rural Roads under (PMGSY) Programme in Bihar,Package – 15A |
22 | Lenders Independent Engineers (LIE) for M/s Guruvayoor Infrastructure Pvt. Ltd. for its road project at Kerala (Thrissur to Edapally on NH-47) |
23 | Lenders' Independent Engineer (LIE) for new four lane Gwalior Bypass Road Project from km 103 on NH-3 to km 16 on NH-75 in the State of Madhya Pradesh |
24 | Feasibility study for 4 laning of Dabwali – Malout section of NH-10 Km. 317.000 to km. 344.540 on (DBFO) pattern. |
25 | Lenders’ Independent Engineer (LIE) for Delhi-Haryana Border to Rohtak Section of NH-10 from km 29.70 to km 87.00 including construction of Bahadurgarh and Rohtak Bypasses in the State of Haryana under NHDP Phase IIIA on Build, Operate and Transfer (BOT) Basis |
26 | Pre-Tendering Services for Four laning of Barelly – Sitapur Section of NH-24 from KM 262.000 To Km 413.200 in the state of UP Under NHDP Phase III on Design , Build, Finance, Operate and Transfer ( The DBFOT) Basis. |
27 | Preliminary design of Santna-Chitrakoot Road on BOT basis |
28 | Preliminary Design of Ujjain-Unhel-Nagda-Jaora Road on BOT basis |
29 | Pre-tendering services for 4 laning of Lebad (SH-31) to Manpur (NH-3) Road |
30 | Pre-tendering Preliminary Design and cost Estimate for Trichy- Karaikkudi section of NH-210 from (Km 10.00 to Km 94.00) and Trichy Byapss from (Km 109.558 to Km 135.930) in the State of Tamil Nadu on DBFOT Annuity Basis. |
31 | Appointment of Consultant for preparation of Detailed Project Report for development of Bharatpur - Roopwas - Dhaulpur, Bakauli Mor to Kheria Mod Road highway |
32 | Lenders' Independent Engineer for 83.2 KM 4 lanning North Malabar Expressway Connecting Kannur with Vengalam. |
33 | Lenders' Independent Engineer for 81 KM 4 lanning South Malabar Expressway Connecting Vengalam with Kuttipuram in Kerala. |
34 | Feasibility & DPR for Construction of Green Field 2 lane SH from Bhangha – Kanhauli Road (170kms including BOP) via Inarwa – Sikhta – Raxaul- Ghorasan – Guabari along the Indo – Nepal Border in the state of Bihar. |
35 | Lenders' Independent Engineer for construction of 4 laning of Haridwar-Dehradun Section of NH-58 & NH-72 of total stretch of 39.03 kms in Uttarakhand on Annuity, (DBFOT) basis |
36 | Pre Tendering Preliminary Design & Cost Estimate for Kota-Jhalawar BOT (Toll) project, Rajasthan |
37 | Lenders' Independent Engineer (LE) for 4- Lane Gwalior Bypass Road Project from Km 103 o NH-3 to Km 16 on NH-75 in the State of MP |
38 | Feasibility Study DPR for State Highway (SH-58) Kishungunj-Chausa- Lawalagam -Vijayghat Road (35.70kms) in the State of Bihar under BSHP Phase-III, North Bihar, Package-I. |
39 | Design & Supervision consultancy for restoration of roads in Uttarakhan emergency Assistance Project (UEAP)DSC Package: PWD/UEAP/DSC-1 Kumaon " Design SC-1 Kumaoun (point 11 to 22) |
40 | Feasibility Study and DPR for widening & Strengthening of NH 44 -104 kms long HIll Road from km 318.00 to 422.00 Tripura. |
41 | Proof Checking for widening and strengthening of Jodhpur-Barner Section of NH-112 (Jodhpur to Pachpadra Package-1 with two lane with paved shoulder/four lane from KM 140.00 to KM 225.615 under NHD-IV in the state of Rajasthan on EPC Mode |
42 | DPR for 35 km lomg Gadarpur-Dineshpur-Malkota Sate Highway in the District of Rudrapur (Uttarakhand) |
43 | Construction Supervision Services for widening of East Coast Road (ECR) from double lane into four lane from km 22/300 to km 55/800 including improvements to curved stretches-13 Nos & Junctions -7Nos. From Km 55/800 to Km 135/500 IN Chennai in the state of Tamil Nadu -India |
44 | DPR & Cosntruction Supervison for "Long Term Output and performance based Road Maintenance Work for the roads under Road Division, Banka (Package No.43/OPRMC/Banka)amounting to Rs.32,25,52,297/- |
45 | DPR & Construction Supervision for "Long Term Output and performance based Road Maintenance Work for the roads under Road Division, Banka (Package No.44/OPRMC/Banka) |
The Management staff and Employees of VKS INFRATECH MANAGEMENT PVT. LTD. are committed
to provide Technical Consulting Services from Inception to Commissioning...