Highway Projects Project Category



S. No. Name of Projects
1 Feasibility Study and Detailed Project Report for 4/6 laning of selected project under Group-A of NHDP-II - Kottakata to Kurnool Section of NH-7 from Km. 133 to Km. 211 in the State of Andhra Pradesh.
2 Quality Assurance System for 4 laning of NH-2 in U.P. for World Bank Funded Project:

1. Allahabad – Khaga Highway

2. Varanasi – Handia Highway
3 Advisory Services and Quality Assurance System for the Project "Four laning of Km. 143/0 to Km 160/0 of Gondal Ribda Section of NH 8B in the State of Gujarat under Phase-II Programme of North-South & East-West Corridors Project" Contract Package No. EW-10/GJ.
4 Pre Tendering, Preliminary Design and cost estimate for 4 laning of 41 km long 2 lane National Highway from Nagpur (Km 9.2) to Kondhali (Km 50) on BOT under Non-NHDP Project of NHAI.
5 Pre Tendering, Preliminary design and Cost estimmate for 4 laning of 50 km long 2 lane National Highway from Kondhali (Km 50) to Talegaon (Km 100) on BOT under Non-NHDP Project of NHAI.
6 Pre Tendering, Preliminary design and Cost estimmate for 4 laning of 50 km long 2 lane National Highway from Indore (Km 50) to Kalaghat (Km 100) on BOT under Non-NHDP Project of NHAI.
7 Detailed Design of State Highway Section between Phalodi and Sanchore (Gujarat Border) – 286 Kms. of 2 lane / single lane Highway on BOT.
8 Pre Tendering, Preliminary design and Cost estimmate for 4 laning of 2 lane National Highway from Ambala to Chandigarh in Punjab – BOT under Non NHDP Project of NHAI.
9 Pre Tendering, Preliminary design and Cost estimmate 4 laning of 50 Km long 2 lane National Highway from Jallandhar to Amritsar on BOT under Non-NHDP Project of NHAI.
10 Feasibility Report & Detailed Projects Report for Chas – Ramgarh – Dhanbad – Gumla Section of NH-32 & NH-23 in the State of Jharkhand
11 Construction Supervision and Quality Control of City Roads in Jabalpur (Chhotiline Phatak to Medical College of 6.200 Kms.) in the State of Madhya Pradesh.
12 Pre Tendering, Preliminary design and Cost estimmate for 4-laning of Palanpur - Swaroopganj Section (Km. 264.00 to Km. 340.00 of NH-14) in the States of Gujarat & Rajasthan under East-West Corridor of NHDP in India.
13 Project Advisory consultacy Services including review of Detailed Project Report for four laning of Orai - Bhognipur Section (Km. 220.00 to Km. 255.00) of NH-25) & Bhognipur - Barah Section (Km. 421.20 to Km. 449.00 of NH-2) in the State of U.P. under East West Corridor of NHDP in India.
14 Review of detailed Design & Construction Supervision for 4-laning & strengthening of existing 2-lane from Trichy Bypass End (Km. 0.0) to Madurai (Km. 124.840) of NH-45B (Package VII-A & VII-B) (DESIGN PART) (CONSTRUCTION PART)
15 Pre Tendering, Preliminary design and Cost estimmate for 4-laning of Kurali - Kiratpur Section (Km. 28.600 to Km. 73.200 of NH-21 in the State of Punjab)
16 Pre Tendering, Preliminary design and Cost estimmate for 4-laning of Muzaffarnagar - Haridwar Section (Km. 131.000 to Km. 209.000 of NH-58 in the State of U.P. & Uttaranchal
17 Feasibility Study and DPR for Construction of Manali Bypass on NH-21 in Himachal Pradesh.
18 Consultancy Services for the Pre tendering Services for Delhi-Haryana Border to Rohtak Section of NH-10 under DBFOT
19 Lenders' Independent Engineer for Orai Bhognipur NH 2 UP
20 Consultancy Services for the Construction Supervision of 6 Lane Divided Carriage- Way of Ranchi Ring Road Section-VII
21 World Bank funded Feasibility & DDPR for construction, Up gradation and Improvement of Rural Roads under (PMGSY) Programme in Bihar,Package – 15A
22 Lenders Independent Engineers (LIE) for M/s Guruvayoor Infrastructure Pvt. Ltd. for its road project at Kerala (Thrissur to Edapally on NH-47)
23 Lenders' Independent Engineer (LIE) for new four lane Gwalior Bypass Road Project from km 103 on NH-3 to km 16 on NH-75 in the State of Madhya Pradesh
24 Feasibility study for 4 laning of Dabwali – Malout section of NH-10 Km. 317.000 to km. 344.540 on (DBFO) pattern.
25 Lenders’ Independent Engineer (LIE) for Delhi-Haryana Border to Rohtak Section of NH-10 from km 29.70 to km 87.00 including construction of Bahadurgarh and Rohtak Bypasses in the State of Haryana under NHDP Phase IIIA on Build, Operate and Transfer (BOT) Basis
26 Pre-Tendering Services for Four laning of Barelly – Sitapur Section of NH-24 from KM 262.000 To Km 413.200 in the state of UP Under NHDP Phase III on Design , Build, Finance, Operate and Transfer ( The DBFOT) Basis.
27 Preliminary design of Santna-Chitrakoot Road on BOT basis
28 Preliminary Design of Ujjain-Unhel-Nagda-Jaora Road on BOT basis
29 Pre-tendering services for 4 laning of Lebad (SH-31) to Manpur (NH-3) Road
30 Pre-tendering Preliminary Design and cost Estimate for Trichy- Karaikkudi section of NH-210 from (Km 10.00 to Km 94.00) and Trichy Byapss from (Km 109.558 to Km 135.930) in the State of Tamil Nadu on DBFOT Annuity Basis.
31 Appointment of Consultant for preparation of Detailed Project Report for development of Bharatpur - Roopwas - Dhaulpur, Bakauli Mor to Kheria Mod Road highway
32 Lenders' Independent Engineer for 83.2 KM 4 lanning North Malabar Expressway Connecting Kannur with Vengalam.
33 Lenders' Independent Engineer for 81 KM 4 lanning South Malabar Expressway Connecting Vengalam with Kuttipuram in Kerala.
34 Feasibility & DPR for Construction of Green Field 2 lane SH from Bhangha – Kanhauli Road (170kms including BOP) via Inarwa – Sikhta – Raxaul- Ghorasan – Guabari along the Indo – Nepal Border in the state of Bihar.
35 Lenders' Independent Engineer for construction of 4 laning of Haridwar-Dehradun Section of NH-58 & NH-72 of total stretch of 39.03 kms in Uttarakhand on Annuity, (DBFOT) basis
36 Pre Tendering Preliminary Design & Cost Estimate for Kota-Jhalawar BOT (Toll) project, Rajasthan
37 Lenders' Independent Engineer (LE) for 4- Lane Gwalior Bypass Road Project from Km 103 o NH-3 to Km 16 on NH-75 in the State of MP
38 Feasibility Study DPR for State Highway (SH-58) Kishungunj-Chausa- Lawalagam -Vijayghat Road (35.70kms) in the State of Bihar under BSHP Phase-III, North Bihar, Package-I.
39 Design & Supervision consultancy for restoration of roads in Uttarakhan emergency Assistance Project (UEAP)DSC Package: PWD/UEAP/DSC-1 Kumaon " Design SC-1 Kumaoun (point 11 to 22)
40 Feasibility Study and DPR for widening & Strengthening of NH 44 -104 kms long HIll Road from km 318.00 to 422.00 Tripura.
41 Proof Checking for widening and strengthening of Jodhpur-Barner Section of NH-112 (Jodhpur to Pachpadra Package-1 with two lane with paved shoulder/four lane from KM 140.00 to KM 225.615 under NHD-IV in the state of Rajasthan on EPC Mode
42 DPR for 35 km lomg Gadarpur-Dineshpur-Malkota Sate Highway in the District of Rudrapur (Uttarakhand)
43 Construction Supervision Services for widening of East Coast Road (ECR) from double lane into four lane from km 22/300 to km 55/800 including improvements to curved stretches-13 Nos & Junctions -7Nos. From Km 55/800 to Km 135/500 IN Chennai in the state of Tamil Nadu -India
44 DPR & Cosntruction Supervison for "Long Term Output and performance based Road Maintenance Work for the roads under Road Division, Banka (Package No.43/OPRMC/Banka)amounting to Rs.32,25,52,297/-
45 DPR & Construction Supervision for "Long Term Output and performance based Road Maintenance Work for the roads under Road Division, Banka (Package No.44/OPRMC/Banka)

 

Awards Quality Policy

The Management staff and Employees of VKS INFRATECH MANAGEMENT PVT. LTD. are committed to provide Technical Consulting Services from Inception to Commissioning...
Read More

Clients

Clients

Follow Us

facebook   

Contact Address

Registered Office:

VKS Infratech Management Pvt. Ltd.
11B, Pkt - D, SFS Flats,
Mayur Vihar, Phase - III, Delhi, India

 

Head Office:

VKS Infratech Management Pvt. Ltd.
H.No. - 181, Lane No. - 18, Pratap Nagar
Opp. Pkt. - IV Mayur Vihar, Phase - I
Delhi - 110091, India
TEL:91-11-22793217/18/19
FAX: 91-11-22793220

Copyright © 2004-15 VKSIMPL, All rights reserved.

Privacy Policy | Disclaimer | Sitemap

Website designed by www.softnect.com